Pages that link to "Item:Q1868816"
From MaRDI portal
The following pages link to Single-machine scheduling with periodic maintenance and nonresumable jobs. (Q1868816):
Displaying 44 items.
- Human resources scheduling to improve the product quality according to exhaustion limit (Q287639) (← links)
- Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling (Q300062) (← links)
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate (Q337585) (← links)
- Patient scheduling with periodic deteriorating maintenance on single medical device (Q342021) (← links)
- Scheduling two parallel machines with machine-dependent availabilities (Q342363) (← links)
- Single machine scheduling problem with two synergetic agents and piece-rate maintenance (Q350484) (← links)
- Single-machine scheduling with periodic maintenance to minimize makespan revisited (Q398924) (← links)
- Single-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing times (Q505770) (← links)
- A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times (Q552221) (← links)
- A single machine scheduling problem with availability constraints and sequence-dependent setup costs (Q552454) (← links)
- Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval (Q726392) (← links)
- Single-machine scheduling with periodic maintenance to minimize makespan (Q858282) (← links)
- Scheduling with tool changes to minimize total completion time under controllable machining conditions (Q868153) (← links)
- Managing a portfolio of long term service agreements (Q884067) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan (Q941557) (← links)
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance (Q967809) (← links)
- Makespan minimization for two parallel machines scheduling with a periodic availability constraint (Q1000962) (← links)
- Scheduling a maintenance activity to minimize total weighted completion-time (Q1029850) (← links)
- The scheduling of maintenance service (Q1383367) (← links)
- Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities (Q1639885) (← links)
- Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates (Q1652182) (← links)
- A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine (Q1653363) (← links)
- Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness (Q1666458) (← links)
- Maintenance scheduling problem with fuzzy random time windows on a single machine (Q1707500) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times (Q1754111) (← links)
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance (Q1761146) (← links)
- Makespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies (Q1789450) (← links)
- Non-resumable scheduling on a single bounded parallel-batch machine with periodic maintenance (Q2156319) (← links)
- A single-machine scheduling problem with maintenance activities to minimize makespan (Q2266971) (← links)
- Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance (Q2301137) (← links)
- Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period (Q2467254) (← links)
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan (Q2482821) (← links)
- Two-machine scheduling with periodic availability constraints to minimize makespan (Q2514681) (← links)
- Scheduling the maintenance on a single machine (Q3154418) (← links)
- An Extended Sequential Imperfect Preventive Maintenance Model with Improvement Factors (Q3168532) (← links)
- Sequencing heuristic for bicriteria scheduling in a single machine problem (Q3411893) (← links)
- Single-machine scheduling with flexible and periodic maintenance (Q3418856) (← links)
- Scheduling Position-Dependent Maintenance Operations (Q4602478) (← links)
- Optimum sequential preventive maintenance first or last policies with imperfect maintenance for a system subject to shocks (Q5079221) (← links)
- Minimizing maximum tardiness in single FMS machine scheduling with tool changes (Q5188152) (← links)
- Scheduling with day shifts and breaks (Q6070109) (← links)
- Improved approaches to minimize the makespan on single-machine scheduling with periodic preventive maintenance activities (Q6534463) (← links)