Pages that link to "Item:Q1869711"
From MaRDI portal
The following pages link to On two single machine scheduling problems with fuzzy processing times and fuzzy due dates (Q1869711):
Displaying 17 items.
- Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates (Q697023) (← links)
- Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines (Q962838) (← links)
- Two scheduling problems with fuzzy due-dates (Q1198861) (← links)
- One machine scheduling problem with fuzzy duedates (Q1342032) (← links)
- The single machine ready time scheduling problem with fuzzy processing times (Q1605064) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- Minimizing maximum cost for a single machine under uncertainty of processing times (Q2184134) (← links)
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine (Q2429059) (← links)
- Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness (Q2813467) (← links)
- Single machine fuzzy scheduling problem with release dates (Q2992733) (← links)
- A class of polynomially solvable algorithm for due date assignment scheduling problem with asymmetric fuzzy processing time (Q3131383) (← links)
- SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM (Q3442757) (← links)
- USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES (Q3524397) (← links)
- USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS (Q3638815) (← links)
- (Q5400032) (← links)
- Fuzzy approach for production planning and detailed scheduling in paints manufacturing (Q5438612) (← links)
- Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells (Q5444618) (← links)