Pages that link to "Item:Q1885984"
From MaRDI portal
The following pages link to A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling (Q1885984):
Displaying 9 items.
- Optimizing temporary work and overtime in the time cost quality trade-off problem (Q2178101) (← links)
- Modeling single machine preemptive scheduling problems for computational efficiency (Q2288995) (← links)
- Multi-coloring and job-scheduling with assignment and incompatibility costs (Q2449346) (← links)
- Predictive-reactive scheduling on a single resource with uncertain future jobs (Q2482799) (← links)
- Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling (Q3498906) (← links)
- The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization (Q3802872) (← links)
- An evaluation of scheduling heuristics for dynamic single-processor scheduling with early/tardy costs (Q4883157) (← links)
- Overtime Scheduling: An Application in Finite-capacity Real-time Scheduling (Q5285354) (← links)
- An heuristic approach for solving OSSP with a objective of minimizing total completion time and resource idleness (Q6051979) (← links)