The following pages link to Johnny C. Ho (Q195301):
Displaying 17 items.
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (Q732893) (← links)
- An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems (Q875402) (← links)
- Minimizing the number of tardy jobs for \(m\) parallel machines (Q1127174) (← links)
- Flowshop sequencing with mean flowtime objective (Q1130072) (← links)
- Flowshop scheduling with dominant machines (Q1342341) (← links)
- Uncertainty and the acquisition of capacity: A competitive analysis (Q1342944) (← links)
- Single machine hierarchical scheduling with customer orders and multiple job classes (Q1374425) (← links)
- A new heuristic for workload balancing on identical parallel machines and a statistical perspective on the workload balancing criteria (Q1762126) (← links)
- The impacts of technology evolution on market structure for green products (Q1931066) (← links)
- A new heuristic for the n-job, M-machine flow-shop problem (Q2277356) (← links)
- A note on posterior tight worst-case bounds for longest processing time schedules (Q2423296) (← links)
- The parallel machine scheduling problem with variable demand and a pre-defined lot size (Q2627277) (← links)
- Two modifications of the least cost per period heuristic for dynamic lot-sizing (Q3409576) (← links)
- Makespan minimization for \(m\) parallel identical processors (Q4865763) (← links)
- Minimizing flowtime subject to optimal makespan on two identical parallel machines (Q5189089) (← links)
- Heuristics for minimizing mean tardiness form parallel machines (Q5202825) (← links)
- Minimizing makespan subject to minimum flowtime on two identical parallel machines (Q5939974) (← links)