Pages that link to "Item:Q1984951"
From MaRDI portal
The following pages link to A multi-objective hot-rolling scheduling problem in the compact strip production (Q1984951):
Displaying 8 items.
- The hot strip mill production scheduling problem: A tabu search approach (Q1609896) (← links)
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill (Q1761983) (← links)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants (Q2003439) (← links)
- Modeling and application for rolling scheduling problem based on TSP (Q2243302) (← links)
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production (Q2293881) (← links)
- The hot-rolling batch scheduling method based on the prize collecting vehicle routing problem (Q2379818) (← links)
- Multi-objective operation optimization of continuous production process with safety constraints (Q5381222) (← links)
- Scheduling a hot rolling mill (Q5428937) (← links)