Pages that link to "Item:Q1993083"
From MaRDI portal
The following pages link to A new energy-aware flexible job shop scheduling method using modified biogeography-based optimization (Q1993083):
Displaying 12 items.
- Energy-oriented scheduling based on evolutionary algorithms (Q337370) (← links)
- A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost (Q1652653) (← links)
- A modified biogeography-based optimization for the flexible job shop scheduling problem (Q1664896) (← links)
- Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout (Q1712074) (← links)
- Job shop scheduling with flexible energy prices and time windows (Q2050258) (← links)
- Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing (Q2283857) (← links)
- A study on PGEP to evolve heuristic rules for FJSSP considering the total cost of energy consumption and weighted tardiness (Q2327435) (← links)
- A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: trade-off between production costs and energy consumption (Q2656739) (← links)
- A bi-objective optimization model for integrated process planning and scheduling based on an improved algorithm (Q3462942) (← links)
- (Q5383440) (← links)
- A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time (Q6048213) (← links)
- Energy cost efficient scheduling in flexible job-shop manufacturing systems (Q6113446) (← links)