Pages that link to "Item:Q2018998"
From MaRDI portal
The following pages link to An integrated multi-objective framework for solving multi-period project selection problems (Q2018998):
Displaying 10 items.
- Generation of the exact Pareto set in multi-objective traveling salesman and set covering problems (Q274932) (← links)
- Multiobjective project portfolio selection with fuzzy constraints (Q342776) (← links)
- A fuzzy multidimensional multiple-choice knapsack model for project portfolio selection using an evolutionary algorithm (Q363591) (← links)
- Solving multi-period project selection problems with fuzzy goal programming based on TOPSIS and a fuzzy preference relation (Q497650) (← links)
- A multiobjective evolutionary approach for linearly constrained project selection under uncertainty (Q864003) (← links)
- A new bi-objective location-routing problem for distribution of perishable products: evolutionary computation approach (Q894544) (← links)
- A non-probabilistic methodology for reliable sustainability planning: an application to the Iraqi national irrigation system (Q2281810) (← links)
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (Q3458826) (← links)
- Non‐dominated “trade‐off” solutions in television scheduling optimization (Q5257897) (← links)
- A literature survey on project portfolio selection problem (Q6602077) (← links)