Pages that link to "Item:Q2030539"
From MaRDI portal
The following pages link to A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539):
Displaying 7 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- Staff and machine shift scheduling in a German potash mine (Q1702661) (← links)
- Short-term scheduling of production fleets in underground mines using CP-based LNS (Q2117237) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- Optimization of the integrated problem of employee timetabling and job shop scheduling (Q2669607) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Exact algorithms for a parallel machine scheduling problem with workforce and contiguity constraints (Q6551087) (← links)