Pages that link to "Item:Q2030698"
From MaRDI portal
The following pages link to A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698):
Displaying 24 items.
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem (Q310345) (← links)
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing (Q928039) (← links)
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem (Q2084041) (← links)
- Weighted completion time minimization for capacitated parallel machines (Q2085744) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Optimizing resource-constrained project scheduling problem considering the reliability function (Q2163632) (← links)
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method (Q2726429) (← links)
- (Q4641067) (← links)
- Multi-mode bi-objective proactive project scheduling optimization considering robust cost (Q4996288) (← links)
- Dynamic resource allocation and collaborative scheduling in R\&D and manufacturing processes of high-end equipment with budget constraint (Q6043112) (← links)
- Project scheduling cost optimization based on resource transfer costs and robustness (Q6065647) (← links)
- \(\Gamma\)-robust optimization of project scheduling problems (Q6065662) (← links)
- Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration (Q6090155) (← links)
- An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows (Q6551096) (← links)
- Robust scheduling for minimizing maximum lateness on a serial-batch processing machine (Q6551700) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)
- Shortening the project schedule: solving multimode chance-constrained critical chain buffer management using reinforcement learning (Q6581386) (← links)
- A theoretical and empirical study of job scheduling in cloud computing environments: the weighted completion time minimization problem with capacitated parallel machines (Q6588490) (← links)
- A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty (Q6601552) (← links)