Pages that link to "Item:Q2030702"
From MaRDI portal
The following pages link to Integrating risk into estimations of project activities' time and cost: a stratified approach (Q2030702):
Displaying 7 items.
- Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment (Q2242316) (← links)
- Managing uncertainty in major equipment procurement in engineering projects (Q2576250) (← links)
- (Q3404766) (← links)
- CAUTIOUS ANALYSIS OF PROJECT RISKS BY INTERVAL-VALUED INITIAL DATA (Q3427039) (← links)
- Impact of Compound and Reduced Specification on Valuation of Projects with Multiple Risks (Q5118191) (← links)
- Supplier selection to support environmental sustainability: the stratified BWM TOPSIS method (Q6099449) (← links)
- Green, resilient, and inclusive supplier selection using enhanced BWM-TOPSIS with scenario-varying Z-numbers and reversed PageRank (Q6554895) (← links)