Pages that link to "Item:Q2038518"
From MaRDI portal
The following pages link to Algebraic solution of a problem of optimal project scheduling in project management (Q2038518):
Displaying 4 items.
- Tropical optimization problems with application to project scheduling with minimum makespan (Q1699128) (← links)
- Algebraic solution to optimal scheduling problems taking into account the scheduled start time of jobs in projects (Q2688535) (← links)
- Application of idempotent algebra methods in genetic algorithm for solving the scheduling problem (Q5871445) (← links)
- Application of tropical optimization for solving multicriteria problems of pairwise comparisons using log-Chebyshev approximation (Q6570320) (← links)