The following pages link to Taeho Park (Q203970):
Displaying 6 items.
- (Q323489) (redirect page) (← links)
- Admission and inventory control of a single-component make-to-order production system with replenishment setup cost and lead time (Q323490) (← links)
- Allocating data and workload among multiple servers in a local area network (Q1891015) (← links)
- An empirical test of Tobit model robustness in estimating online auction prices over various distributions (Q2204296) (← links)
- A model for determining job throughput times for manufacturing flow line workcells with finite buffers (Q3354587) (← links)
- Multicriteria hub decision making for rural area telecommunication networks (Q5943929) (← links)