Pages that link to "Item:Q2040718"
From MaRDI portal
The following pages link to Uncertainty integration in dynamic mining reserves (Q2040718):
Displaying 11 items.
- Forecasting recoverable ore reserves and their uncertainty at Morila gold deposit, Mali: an efficient simulation approach and future grade control drilling (Q500787) (← links)
- Valuing mineral reserves when capacity constrains production (Q1274203) (← links)
- A study of the influence of measurement volume, blending ratios and sensor precision on real-time reconciliation of grade control models (Q1622861) (← links)
- A method for integrated process simulation in the mining industry (Q1681452) (← links)
- Conditional simulation for mineral resource classification and mining dilution assessment from the early 1990s to now (Q2022113) (← links)
- A matheuristic approach for optimizing mineral value chains under uncertainty (Q2147943) (← links)
- Resource model updating for compositional geometallurgical variables (Q2238081) (← links)
- Incorporating overconfidence into real option decision-making model of metal mineral resources mining project (Q2320704) (← links)
- The extraction of natural resources from two sites under uncertainty (Q2442562) (← links)
- Mining Co-locations under Uncertainty (Q2847577) (← links)
- An Economic Model for Evaluating Mining and Manufacturing Ventures with Output Yield Uncertainty (Q3635029) (← links)