Pages that link to "Item:Q2124913"
From MaRDI portal
The following pages link to Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times (Q2124913):
Displaying 4 items.
- A general variable neighborhood search algorithm for a parallel-machine scheduling problem considering machine health conditions and preventive maintenance (Q2147013) (← links)
- Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry (Q6109347) (← links)
- (Q6117540) (← links)
- Graph coloring approaches for a production planning problem with makespan and setup penalties in a product-wheel context (Q6559404) (← links)