The following pages link to R. A. Bowman (Q213352):
Displaying 7 items.
- Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation (Q1805493) (← links)
- Developing activity duration specification limits for effective project control (Q2503086) (← links)
- Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters (Q3512384) (← links)
- Stochastic Analysis of Cyclic Schedules (Q4286473) (← links)
- Sensitivity curves for effective project management (Q4456078) (← links)
- Efficient Estimation of Arc Criticalities in Stochastic Activity Networks (Q4838072) (← links)
- Due date-based metrics for activity importance in stochastic activity networks (Q5948193) (← links)