Pages that link to "Item:Q2150762"
From MaRDI portal
The following pages link to A dynamic programming approach to a multi-objective disassembly line balancing problem (Q2150762):
Displaying 10 items.
- A disassembly line balancing problem with fixed number of workstations (Q321005) (← links)
- A sample average approximation method for disassembly line balancing problem under uncertainty (Q337118) (← links)
- A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times (Q828843) (← links)
- Solving the disassembly-to-order problem using linear physical programming (Q843381) (← links)
- A balancing method and genetic algorithm for disassembly line balancing (Q863983) (← links)
- A branch, bound, and remember algorithm for the simple disassembly line balancing problem (Q1722962) (← links)
- Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations (Q1728489) (← links)
- Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems (Q1821677) (← links)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches (Q2108816) (← links)
- (Q2951294) (← links)