The following pages link to Surendra M. Gupta (Q222768):
Displaying 34 items.
- A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem (Q324311) (← links)
- Solving the disassembly-to-order problem using linear physical programming (Q843381) (← links)
- A balancing method and genetic algorithm for disassembly line balancing (Q863983) (← links)
- A path-relinking approach for a bi-criteria disassembly sequencing problem (Q925845) (← links)
- Complementarity and equivalence in finite source queueing models with spares (Q1317074) (← links)
- Finite source Erlang based queueing systems: Complementarity, equivalence and their implications (Q1336883) (← links)
- Duality relations for queues with arrival and service control (Q1362953) (← links)
- Expansion method for the throughput analysis of open finite manufacturing/queueing networks with \(N\)-policy (Q1819235) (← links)
- Interrelationship between controlling arrival and service in queueing systems (Q1905080) (← links)
- Production systems with interruptions, arbitrary topology and finite buffers (Q1977992) (← links)
- A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system (Q2256156) (← links)
- \(N\)-policy queueing system with finite source and warm spares. (Q2468607) (← links)
- (Q3090547) (← links)
- Response Surface Methodology Applied to Toll Plaza Design for the Transition to Electronic Toll Collection (Q3146127) (← links)
- Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling (Q3377159) (← links)
- Methods for optimum and near optimum disassembly sequencing (Q3498871) (← links)
- Analysis of two-unit stand-by redundant system under partial failure and pre-emptive repair priority (Q3941167) (← links)
- Analysis of a two-unit cold standby redundant system with allowed down-time (Q3968734) (← links)
- Heuristic and optimal approaches to lot-sizing incorporating backorders: an empirical evaluation (Q4034176) (← links)
- Petri net models of flexible and automated manufacturing systems: a survey (Q4230288) (← links)
- Development of the surface mount assembly process through an angular board orientation (Q4245615) (← links)
- The effect of sudden material handling system breakdown on the performance of a JIT system (Q4245621) (← links)
- Control of arrivals in a finite buffered queue with setup costs (Q4366458) (← links)
- Scheduling disassembly (Q4394319) (← links)
- MRP systems under supply and process uncertainty in an integrated shop floor control environment (Q4398902) (← links)
- Stochastic coloured Petri net (SCPN) models of traditional and flexible kanban systems (Q4497041) (← links)
- (Q4546422) (← links)
- Disassembly line in product recovery (Q4807210) (← links)
- The Finite Capacity GI/M/1 Queue with Server Vacations (Q4888199) (← links)
- Duality in Truncated Steady-State Erlang Distribution-Based Queueing Processes (Q5287229) (← links)
- Deterministic Search Algorithm for Sequencing and Scheduling (Q5302317) (← links)
- Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem (Q5444547) (← links)
- Optimal pricing of reusable and recyclable components under alternative product acquisition mechanisms (Q5444561) (← links)
- Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships (Q5952445) (← links)