Pages that link to "Item:Q2239892"
From MaRDI portal
The following pages link to An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times (Q2239892):
Displaying 19 items.
- Robust berth scheduling at marine container terminals via hierarchical optimization (Q336840) (← links)
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time (Q613450) (← links)
- Robust berth scheduling with uncertain vessel delay and handling time (Q763208) (← links)
- Robust cyclic berth planning of container vessels (Q989624) (← links)
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem (Q1694325) (← links)
- Real-time management of berth allocation with stochastic arrival and handling times (Q1707673) (← links)
- Robust scheduling for berth allocation and quay crane assignment problem (Q1719234) (← links)
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion (Q1753475) (← links)
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey (Q2158003) (← links)
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination (Q2691472) (← links)
- Simultaneous operation of next-generation and traditional quay cranes at container terminals (Q6112695) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Robust optimization for the integrated berth allocation and quay crane assignment problem (Q6130707) (← links)
- Improved sequential insertion heuristics for berth allocation problems (Q6146631) (← links)
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition (Q6164635) (← links)
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model (Q6187236) (← links)
- Proactive berth scheduling with data-driven buffer time in container terminals (Q6495372) (← links)
- Robust optimization for a steel production planning problem with uncertain demand and product substitution (Q6561215) (← links)
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems (Q6568488) (← links)