Pages that link to "Item:Q2241579"
From MaRDI portal
The following pages link to Minmax due-date assignment on a two-machine flowshop (Q2241579):
Displaying 11 items.
- A note: minmax due-date assignment problem with lead-time cost (Q336460) (← links)
- Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date (Q947941) (← links)
- Minimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problem (Q1262204) (← links)
- A note on a due-date assignment on a two-machine flow-shop (Q1765554) (← links)
- Minmax due-date assignment with a time window for acceptable lead-times (Q2449349) (← links)
- (Q3690567) (← links)
- (Q3754430) (← links)
- Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates (Q5216799) (← links)
- Single machine slack due window assignment and deteriorating jobs (Q6149338) (← links)
- INEH-VNS algorithm solved automatic production system scheduling problem under just-in-time environment (Q6535663) (← links)
- Due-date assignment with acceptable lead-times on parallel machines (Q6568406) (← links)