Pages that link to "Item:Q2266971"
From MaRDI portal
The following pages link to A single-machine scheduling problem with maintenance activities to minimize makespan (Q2266971):
Displaying 15 items.
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance (Q337029) (← links)
- Single-machine scheduling with periodic maintenance to minimize makespan revisited (Q398924) (← links)
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval (Q726392) (← links)
- Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints (Q727323) (← links)
- Single-machine scheduling with periodic maintenance to minimize makespan (Q858282) (← links)
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance (Q967809) (← links)
- Scheduling a maintenance activity and due-window assignment on a single machine (Q1010256) (← links)
- Scheduling jobs with maintenance subject to load-dependent duration on a single machine (Q1664968) (← links)
- Robust single machine scheduling with a flexible maintenance activity (Q1738814) (← links)
- Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times (Q1754111) (← links)
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance (Q1761146) (← links)
- Heuristic methods for the single-machine scheduling problem with periodical resource constraints (Q1979180) (← links)
- Equivalence of some different maintenance activities in single-machine scheduling (Q2422132) (← links)
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan (Q2482821) (← links)