Pages that link to "Item:Q2268519"
From MaRDI portal
The following pages link to A cyclic approach to large-scale short-term planning in chemical batch production (Q2268519):
Displaying 6 items.
- Long term scheduling technique for wastewater minimisation in multipurpose batch processes (Q438031) (← links)
- Solving a chemical batch scheduling problem by local search (Q1593517) (← links)
- Planning and scheduling of multistage multiproduct batch plants operating under production campaigns (Q1761766) (← links)
- Advanced production scheduling for batch plants in process industries (Q1850300) (← links)
- (Q5453301) (← links)
- Graph coloring approaches for a production planning problem with makespan and setup penalties in a product-wheel context (Q6559404) (← links)