Pages that link to "Item:Q2275595"
From MaRDI portal
The following pages link to Scheduling just-in-time part supply for mixed-model assembly lines (Q2275595):
Displaying 17 items.
- Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets (Q297414) (← links)
- Cooperative twin-crane scheduling (Q335329) (← links)
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line (Q336585) (← links)
- Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines (Q439371) (← links)
- An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy (Q707140) (← links)
- Part logistics in the automotive industry: decision problems, literature review and research agenda (Q726233) (← links)
- Level scheduling for batched JIT supply (Q973058) (← links)
- Packed parts delivery problem of automotive inbound logistics with a supplier park (Q1628047) (← links)
- A multiobjective optimization algorithm to solve the part feeding problem in mixed-model assembly lines (Q1718886) (← links)
- Scheduling the replenishment of just-in-time supermarkets in assembly plants (Q2362251) (← links)
- Scheduling of inventory releasing jobs to satisfy time-varying demand: an analysis of complexity (Q2434311) (← links)
- (Q2960773) (← links)
- (Q3131278) (← links)
- A note on parts inventory and mass customization for a two-stage JIT supply chain with zero-one type of bills of materials (Q3161784) (← links)
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines (Q4245322) (← links)
- A kanban-based simulation study of a mixed model just-in-time manufacturing line (Q4398958) (← links)
- In-line kitting for part feeding of assembly lines: workload balancing and storage assignment to reduce the workers' walking effort (Q6049391) (← links)