Pages that link to "Item:Q2295174"
From MaRDI portal
The following pages link to Optimal material ordering policy and allocation rule for a manufacturer making multiple products (Q2295174):
Displaying 5 items.
- Material compatibility constraints for make-to-order production planning. (Q1412704) (← links)
- The supplier selection problem of a manufacturing company using the weighted multi-choice goal programming and MINMAX multi-choice goal programming (Q1985160) (← links)
- Material allocation in MRP with tardiness penalties (Q2564888) (← links)
- (Q6160722) (← links)
- Joint optimization of maintenance and spares ordering policy for a use-oriented product-service system with multiple failure modes (Q6579708) (← links)