Pages that link to "Item:Q2337384"
From MaRDI portal
The following pages link to An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study (Q2337384):
Displaying 15 items.
- Research on construction and application for the model of multistage job shop scheduling problem (Q782293) (← links)
- Hybrid flexible flowshop problems: models and solution methods (Q1634549) (← links)
- Stochastic stability analysis of particle swarm optimization with pseudo random number assignment strategy (Q2098028) (← links)
- A variable neighborhood search algorithm for human resource selection and optimization problem in the home appliance manufacturing industry (Q2168721) (← links)
- On convergence analysis of multi-objective particle swarm optimization algorithm (Q2184086) (← links)
- Unique NSGA-II and MOPSO algorithms for improved dynamic cellular manufacturing systems considering human factors (Q2293891) (← links)
- Multi-objective open shop scheduling by considering human error and preventive maintenance (Q2307240) (← links)
- A unique hybrid particle swarm optimisation algorithm for simulation and improvement of crew scheduling problem (Q2627273) (← links)
- A systematic study on meta-heuristic approaches for solving the graph coloring problem (Q2664279) (← links)
- Just-in-time scheduling for a distributed concrete precast flow shop system (Q2668621) (← links)
- Minimization of the total weighted tardiness on a single machine scheduling problem with a position based learning effect and unequal release dates (Q5889183) (← links)
- Exact and metaheuristic algorithms for flow-shop scheduling problems with release dates (Q6094571) (← links)
- A systematic review of multi-objective hybrid flow shop scheduling (Q6112731) (← links)
- A discrete group teaching optimization algorithm for solving many-objective sand casting whole process production scheduling problem (Q6551183) (← links)
- Comparison of lot streaming division methodologies for multi-objective hybrid flowshop scheduling problem by considering limited waiting time (Q6593195) (← links)