Pages that link to "Item:Q2338471"
From MaRDI portal
The following pages link to Application of the preventive maintenance scheduling to increase the equipment reliability: case study- bag filters in cement factory (Q2338471):
Displaying 3 items.
- Recursive operation time maximization model for the maintenance of power generation equipment (Q1762091) (← links)
- Machine reliability and preventive maintenance planning for cellular manufacturing systems (Q2370341) (← links)
- Bayesian decision making in determining optimal leased term and preventive maintenance scheme for leased facilities (Q2666732) (← links)