Pages that link to "Item:Q2341390"
From MaRDI portal
The following pages link to Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness (Q2341390):
Displaying 12 items.
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work (Q2025084) (← links)
- Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion (Q2030503) (← links)
- A survey of due-date related single-machine with two-agent scheduling problem (Q2190270) (← links)
- Unary NP-hardness of preemptive scheduling to minimize total completion time with release times and deadlines (Q2231743) (← links)
- Two-agent scheduling on a single machine with release dates (Q2273652) (← links)
- Scheduling with release dates and preemption to minimize multiple max-form objective functions (Q2327626) (← links)
- Deteriorating jobs scheduling on a single machine with release dates, rejection and a fixed non-availability interval (Q2346517) (← links)
- A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints (Q2356125) (← links)
- (Q5234786) (← links)
- Single-machine preemptive scheduling with release dates involving the total weighted late work criterion (Q6093999) (← links)
- Competitive two-agent scheduling with release dates and preemption on a single machine (Q6116025) (← links)
- Optimal algorithms for preemptive two-agent scheduling on uniform parallel machines (Q6593671) (← links)