Pages that link to "Item:Q2362173"
From MaRDI portal
The following pages link to Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards (Q2362173):
Displaying 10 items.
- How to park freight trains on rail-rail transshipment yards: the train location problem (Q443824) (← links)
- Container supply with multi-trailer trucks: parking strategies to speed up the gantry crane-based loading of freight trains in rail yards (Q1656422) (← links)
- Scheduling shipments in closed-loop sortation conveyors (Q1707667) (← links)
- An integrated model for the transshipment yard scheduling problem (Q1707671) (← links)
- Levelling crane workload in multi-yard rail-road container terminals (Q2030338) (← links)
- When road trains supply freight trains: scheduling the container loading process by gantry crane between multi-trailer trucks and freight trains (Q2362240) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- New bounds and algorithms for the transshipment yard scheduling problem (Q2434300) (← links)
- Determining crane areas in intermodal transshipment yards: the yard partition problem (Q2655623) (← links)
- Synchronisation in vehicle routing: classification schema, modelling framework and literature review (Q6555167) (← links)