Pages that link to "Item:Q2362251"
From MaRDI portal
The following pages link to Scheduling the replenishment of just-in-time supermarkets in assembly plants (Q2362251):
Displaying 9 items.
- Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets (Q297414) (← links)
- Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines (Q439371) (← links)
- Scheduling in-house transport vehicles to feed parts to automotive assembly lines (Q1753431) (← links)
- Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations (Q1993026) (← links)
- Loading tow trains ergonomically for just-in-time part supply (Q2301970) (← links)
- (Q3131278) (← links)
- A sustainable inventory model to study the mixing and bottling plant of single item for cost minimization (Q6063789) (← links)
- Joint replenishment meets scheduling (Q6102849) (← links)
- Cross-docking based factory logistics unitisation process: an approximate dynamic programming approach (Q6168593) (← links)