The following pages link to Shih-Wei Lin (Q238137):
Displaying 24 items.
- Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm (Q336334) (← links)
- Efficient model and heuristic for the intermodal terminal location problem (Q337109) (← links)
- ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times (Q337126) (← links)
- Two-stage approach to the intermodal terminal location problem (Q342263) (← links)
- Inventory models with managerial policy independent of demand (Q418065) (← links)
- A simulated annealing heuristic for the team orienteering problem with time windows (Q439335) (← links)
- Multiprocessor task scheduling in multistage hybrid flowshops: a hybrid artificial bee colony algorithm with bi-directional planning (Q502419) (← links)
- Note on minimax distribution free procedure for integrated inventory model with defective goods and stochastic lead time demand (Q552462) (← links)
- Technical note on \((Q,r,L)\) inventory model with defective items (Q610883) (← links)
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates (Q614053) (← links)
- A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date (Q856323) (← links)
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times (Q958443) (← links)
- Solving the truck and trailer routing problem based on a simulated annealing heuristic (Q959516) (← links)
- The museum visitor routing problem (Q969135) (← links)
- Robust scheduling on a single machine to minimize total flow time (Q1762157) (← links)
- Single-machine scheduling with learning effects and maintenance: a methodological note on some polynomial-time solvable cases (Q1993121) (← links)
- FALSCAL: a fuzzy multidimensional scaling algorithm (Q2459616) (← links)
- Minimizing shifts for personnel task scheduling problems: a three-phase algorithm (Q2514834) (← links)
- Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic (Q3055403) (← links)
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times (Q3055422) (← links)
- Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups (Q3163328) (← links)
- Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach (Q3527930) (← links)
- A Dynamical Ant Colony Optimization with Heuristics for Scheduling Jobs on a Single Machine with a Common Due Date (Q5302316) (← links)
- An efficient two-staged approach for generating block layouts (Q5959399) (← links)