Pages that link to "Item:Q2383106"
From MaRDI portal
The following pages link to Job sequencing and due date assignment in a single machine shop with uncertain processing times (Q2383106):
Displaying 9 items.
- Impact of deadline intervals on behavior of solutions to the random sequencing jobs with deadlines problem (Q1754010) (← links)
- Due-window assignment scheduling problem with stochastic processing times (Q2029364) (← links)
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms (Q2298093) (← links)
- Minimizing earliness and tardiness costs in stochastic scheduling (Q2356252) (← links)
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine (Q2429059) (← links)
- Solving a stochastic single machine problem with initial idle time and quadratic objective (Q2655649) (← links)
- The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times (Q2664350) (← links)
- Due-date assignment for multi-server multi-stage assembly systems (Q5252913) (← links)
- Algorithmic Applications in Management (Q5710124) (← links)