Pages that link to "Item:Q2411179"
From MaRDI portal
The following pages link to An efficient tabu search neighborhood based on reconstruction strategy to solve the blocking job shop scheduling problem (Q2411179):
Displaying 4 items.
- Cyclic job shop scheduling problems with blocking (Q940885) (← links)
- A new neighborhood and tabu search for the blocking job shop (Q967433) (← links)
- Efficient primal heuristic updates for the blocking job shop problem (Q2239845) (← links)
- A Permutation-Based Neighborhood for the Blocking Job-Shop Problem with Total Tardiness Minimization (Q4685816) (← links)