Pages that link to "Item:Q2422744"
From MaRDI portal
The following pages link to Solving the single crane scheduling problem at rail transshipment yards (Q2422744):
Displaying 11 items.
- An integrated model for the transshipment yard scheduling problem (Q1707671) (← links)
- Crane scheduling in railway yards: an analysis of computational complexity (Q1707828) (← links)
- Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines (Q1761100) (← links)
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals (Q1784912) (← links)
- Levelling crane workload in multi-yard rail-road container terminals (Q2030338) (← links)
- Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards (Q2362173) (← links)
- When road trains supply freight trains: scheduling the container loading process by gantry crane between multi-trailer trucks and freight trains (Q2362240) (← links)
- New bounds and algorithms for the transshipment yard scheduling problem (Q2434300) (← links)
- Determining crane areas in intermodal transshipment yards: the yard partition problem (Q2655623) (← links)
- A weighted perfect matching with constraints on weights of its parts (Q5100129) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)