Pages that link to "Item:Q2434329"
From MaRDI portal
The following pages link to Solving the electricity production planning problem by a column generation based heuristic (Q2434329):
Displaying 11 items.
- Maintenance scheduling in the electricity industry: a literature review (Q322753) (← links)
- A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation (Q877611) (← links)
- Integral simplex using decomposition with primal cutting planes (Q1683694) (← links)
- Combining Dantzig-Wolfe and Benders decompositions to solve a large-scale nuclear outage planning problem (Q2076890) (← links)
- An efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problems (Q2093186) (← links)
- A column generation approach to multiscale capacity planning for power-intensive process networks (Q2302360) (← links)
- A 0-1 integer linear programming approach to schedule outages of nuclear power plants (Q2434323) (← links)
- Solving a real-life, large-scale energy management problem (Q2434327) (← links)
- A constraint programming-based approach to a large-scale energy management problem with varied constraints (Q2434333) (← links)
- Integral Column Generation for Set Partitioning Problems with Side Constraints (Q5106424) (← links)
- A column generation algorithm for solving energy system planning problems (Q6159482) (← links)