Pages that link to "Item:Q2450431"
From MaRDI portal
The following pages link to Application of GA optimization for solving precedent relationship problem in project scheduling (Q2450431):
Displaying 3 items.
- Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (Q707776) (← links)
- Genetic algorithm-based multi-objective model for scheduling of linear construction projects (Q945935) (← links)
- A GA optimization model for workgroup-based repetitive scheduling (WoRSM) (Q1005604) (← links)