Pages that link to "Item:Q2482379"
From MaRDI portal
The following pages link to Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379):
Displaying 13 items.
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization (Q473573) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Patient scheduling in hemodialysis service (Q1740427) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Insertion Algorithms with Justification for Solving the Resource-Constrained Project Scheduling Problem (Q5162162) (← links)
- Priority-Rule Methods for Project Scheduling with Work Content Constraints (Q5391849) (← links)
- A constraint-based method for project scheduling with time windows (Q5960034) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)