Pages that link to "Item:Q2491787"
From MaRDI portal
The following pages link to Batch scheduling in a two-level supply chain -- a focus on the supplier (Q2491787):
Displaying 18 items.
- Batching scheduling in a two-level supply chain with earliness and tardiness penalties (Q328087) (← links)
- Batch sizing and just-in-time scheduling with common due date (Q744646) (← links)
- The scheduling of deliveries in a production-distribution system with multiple buyers (Q940913) (← links)
- Single supplier scheduling for multiple deliveries (Q1599327) (← links)
- Supply chain batching problem with identical orders and lifespan (Q1666418) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost (Q1699357) (← links)
- Optimal production schedule in a single-supplier multi-manufacturer supply chain involving time delays in both levels (Q1716998) (← links)
- Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains (Q2268520) (← links)
- Integrated batch sizing and scheduling on a single machine (Q2434256) (← links)
- Coordination of production and transportation in supply chain scheduling (Q2514664) (← links)
- Scheduling in a two-stage supply chain with uncertain parameters (Q2987882) (← links)
- (Q3110617) (← links)
- An on-time delivery improvement model for manufacturing organisations (Q3163349) (← links)
- Fuzzy scheduling of a build-to-order supply chain (Q3518474) (← links)
- Supply Chain Scheduling: Batching and Delivery (Q3637369) (← links)
- Parallel-batching machines scheduling problem with a truncated time-dependent learning effect via a hybrid CS-JADE algorithm (Q4972548) (← links)
- Integrated scheduling on parallel batch processing machines with non-identical capacities (Q5059346) (← links)