Pages that link to "Item:Q2495993"
From MaRDI portal
The following pages link to A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993):
Displaying 4 items.
- Modelling complex assemblies as a queueing network for lead time control (Q858340) (← links)
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms (Q869182) (← links)
- Measurement and optimization of responsiveness in supply chain networks with queueing structures (Q1694322) (← links)
- Due-date assignment for multi-server multi-stage assembly systems (Q5252913) (← links)