Pages that link to "Item:Q2508124"
From MaRDI portal
The following pages link to An integrated approach for modeling and solving the scheduling problem of container handling systems (Q2508124):
Displaying 10 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal (Q872238) (← links)
- Integrated scheduling of handling equipment at automated container terminals (Q940900) (← links)
- Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals (Q2147157) (← links)
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel (Q2184047) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Operation and preventive maintenance scheduling for containerships: mathematical model and solution algorithm (Q2355894) (← links)
- Integrated production and material handling scheduling using mathematical programming and constraint programming (Q2433554) (← links)
- A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals (Q2517476) (← links)
- (Q3072817) (← links)