Pages that link to "Item:Q2519075"
From MaRDI portal
The following pages link to Project selection, scheduling and resource allocation with time dependent returns (Q2519075):
Displaying 14 items.
- Project selection and scheduling with uncertain net income and investment cost (Q297680) (← links)
- Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon (Q319173) (← links)
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (Q322744) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Project selection with discounted returns and multiple constraints (Q1278274) (← links)
- A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem (Q1718076) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- Optimizing resource-constrained project scheduling problem considering the reliability function (Q2163632) (← links)
- Skill-based framework for optimal software project selection and resource allocation (Q2256202) (← links)
- Optimal project selection: Stochastic knapsack with finite time horizon (Q3157368) (← links)
- A zero-one model for project portfolio selection and scheduling (Q3157381) (← links)
- A clustering‐based review on project portfolio optimization methods (Q6092507) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Integer optimization models and algorithms for the multi-period non-shareable resource allocation problem (Q6572832) (← links)