Pages that link to "Item:Q2576682"
From MaRDI portal
The following pages link to A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times (Q2576682):
Displaying 8 items.
- An integrated production and inventory model to dampen upstream demand variability in the supply chain (Q857368) (← links)
- Supplier managed inventory in the OEM supply chain: The impact of relationship types on total costs and cost distribution (Q1017948) (← links)
- Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times (Q1730547) (← links)
- Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior (Q1782155) (← links)
- A computational comparison of cyclical and non-cyclical control for stochastic production-inventory systems (Q3055350) (← links)
- Fill Time, Inventory and Capacity in a Multi-Item Production Line under Heijunka Control (Q5176340) (← links)
- Modeling industrial lot sizing problems: a review (Q5385468) (← links)
- Performance evaluation of a production/inventory system with periodic review and endogenous lead times (Q5436965) (← links)