Pages that link to "Item:Q2576686"
From MaRDI portal
The following pages link to A multiperiod stochastic production planning and sourcing problem with service level constraints (Q2576686):
Displaying 15 items.
- Multiperiod competitive supply chain networks with inventorying and a transportation network equilibrium reformulation (Q400033) (← links)
- Service level robustness in stochastic production planning under random machine breakdowns (Q421490) (← links)
- An approximation-based approach for fuzzy multi-period production planning problem with credibility objective (Q611560) (← links)
- An inventory-transportation system with stochastic demand (Q744222) (← links)
- An uncertain furniture production planning problem with cumulative service levels (Q1701616) (← links)
- Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with \textit{strokes} (Q2052979) (← links)
- Allocation planning under service-level contracts (Q2272313) (← links)
- Probabilistic modeling of multiperiod service levels (Q2355948) (← links)
- Modeling fuzzy multi-period production planning and sourcing problem with credibility service levels (Q2389553) (← links)
- Risk-averse two-stage stochastic programs in furniture plants (Q2454333) (← links)
- Tariff concessions in production sourcing (Q2463506) (← links)
- Dynamic modeling and control of supply chain systems: A review (Q2483501) (← links)
- A robust optimisation model for aggregate and detailed planning of a multi-site procurement-production-distribution system (Q3163741) (← links)
- Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields (Q4018316) (← links)
- Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem (Q6106559) (← links)