Pages that link to "Item:Q2627614"
From MaRDI portal
The following pages link to Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem (Q2627614):
Displaying 5 items.
- A metaheuristic solution approach for the time-constrained project scheduling problem (Q2362168) (← links)
- Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems (Q5464237) (← links)
- Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption (Q6056166) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)