Pages that link to "Item:Q2664315"
From MaRDI portal
The following pages link to Optimizing makespan and stability risks in job shop scheduling (Q2664315):
Displaying 8 items.
- Risk measure of job shop scheduling with random machine breakdowns (Q1654341) (← links)
- A survey of job shop scheduling problem: the types and models (Q2146994) (← links)
- A simulation-optimization framework for generating dynamic dispatching rules for stochastic job shop with earliness and tardiness penalties (Q2669778) (← links)
- Optimization of schedule stability and efficiency under processing time variability and random machine breakdowns in a job shop environment (Q3120633) (← links)
- Robust scheduling of multi-stage flow shop under machine breakdowns following expect-risk rule (Q3180139) (← links)
- Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem (Q6106559) (← links)
- Job-shop scheduling with limited flexible workers considering ergonomic factors using an improved multi-objective discrete Jaya algorithm (Q6551055) (← links)
- Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns (Q6588509) (← links)