Pages that link to "Item:Q2666666"
From MaRDI portal
The following pages link to Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap (Q2666666):
Displaying 7 items.
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Simulated Annealing and Tabu Search for Discrete-Continuous Project Scheduling with Discounted Cash Flows (Q5410240) (← links)
- New pseudo polynomial algorithms for a partial resource-constrained project scheduling problem (Q6102886) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)