Pages that link to "Item:Q2668621"
From MaRDI portal
The following pages link to Just-in-time scheduling for a distributed concrete precast flow shop system (Q2668621):
Displaying 7 items.
- \(N\)-NEH+ algorithm for solving permutation flow shop problems (Q2668738) (← links)
- Multiobjective particle swarm optimization with direction search and differential evolution for distributed flow-shop scheduling problem (Q2688574) (← links)
- A review and classification on distributed permutation flowshop scheduling problems (Q6069211) (← links)
- Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window (Q6164365) (← links)
- Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders (Q6195034) (← links)
- Deterministic constructive \(\nu N\)-NEH+ algorithm to solve permutation flow shop scheduling problem with makespan criterion (Q6551067) (← links)
- A reduced variable neighborhood search for the just in time job shop scheduling problem with sequence dependent setup times (Q6568444) (← links)