Pages that link to "Item:Q2669757"
From MaRDI portal
The following pages link to Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems (Q2669757):
Displaying 11 items.
- Constraint and mathematical programming models for integrated port container terminal operations (Q1626757) (← links)
- New exact methods for the time-invariant berth allocation and quay crane assignment problem (Q1711448) (← links)
- Robust scheduling for berth allocation and quay crane assignment problem (Q1719234) (← links)
- An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability (Q2029972) (← links)
- Integrated laycan and berth allocation and time-invariant quay crane assignment problem in tidal ports with multiple quays (Q2030331) (← links)
- Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems (Q2150520) (← links)
- A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports (Q2256282) (← links)
- Solving a stochastic berth allocation problem using a hybrid sequence pair-based simulated annealing algorithm (Q5059243) (← links)
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition (Q6164635) (← links)
- The berth allocation and quay crane assignment problem with crane travel and setup times (Q6551060) (← links)
- An adaptive large neighborhood search heuristic for the multi-port continuous berth allocation problem (Q6586264) (← links)