Pages that link to "Item:Q276311"
From MaRDI portal
The following pages link to Models for scheduling charges in continuous casting: application to a Brazilian steel plant (Q276311):
Displaying 3 items.
- A GRASP heuristic for slab scheduling at continuous casters (Q480761) (← links)
- Integration of continuous caster and hot strip mill planning for steel production (Q1585914) (← links)
- On the stochastic modeling and analysis of Bloom caster system of continuous casting shop area of an integrated steel plant (Q2820244) (← links)