Pages that link to "Item:Q2783988"
From MaRDI portal
The following pages link to Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources (Q2783988):
Displaying 24 items.
- Simultaneous determination of lot size and production rate at capacity-constrained multiple-product systems (Q638024) (← links)
- Multi-level multi-item lot size planning with limited resources and general manufacturing structure. (Q684381) (← links)
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- Capacitated lot-sizing with extensions: a review (Q926571) (← links)
- Lagrangean relaxation based heuristics for lot sizing with setup times (Q953424) (← links)
- A cross entropy-lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times (Q954053) (← links)
- A heuristic approach for big bucket multi-level production planning problems (Q958084) (← links)
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (Q958558) (← links)
- Finite horizon planning with fixed-interval deliveries and no shortage (Q998721) (← links)
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic (Q1010258) (← links)
- A heuristic method for lot-sizing in multi-stage systems (Q1370714) (← links)
- MIP formulations and heuristics for two-level production-transportation problems (Q1761227) (← links)
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573) (← links)
- A computational analysis of lower bounds for big bucket production planning problems (Q1935570) (← links)
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches (Q2379665) (← links)
- Heuristic algorithms for dynamic capacitated lotsizing for production flow networks with setup times (Q2477097) (← links)
- Single item lot sizing problems (Q2566041) (← links)
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows (Q3635206) (← links)
- Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over (Q3636786) (← links)
- Lot sizing for material requirements planning systems- an incremental cost approach (Q3705205) (← links)
- Optimal Lot-Sizing Algorithms for Complex Product Structures (Q3738876) (← links)
- Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems (Q4286309) (← links)
- An Improved Algorithm for Finding Optimal Lot Sizing Policies for Finite Production Rate Assembly Systems (Q4305759) (← links)
- METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES (Q5315988) (← links)