Pages that link to "Item:Q2825622"
From MaRDI portal
The following pages link to A two-phase algorithm for a resource constrained project scheduling problem with discounted cash flows (Q2825622):
Displaying 3 items.
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. (Q1412119) (← links)
- A two stage search heuristic for scheduling payments in projects (Q5948201) (← links)