Pages that link to "Item:Q2892210"
From MaRDI portal
The following pages link to Optimizing long-term production plans in underground and open-pit copper mines (Q2892210):
Displaying 23 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- Medium range optimization of copper extraction planning under uncertainty in future copper prices (Q297027) (← links)
- Optimization-based heuristics for underground mine scheduling (Q299816) (← links)
- Long term production planning of open pit mines by ant colony optimization (Q300074) (← links)
- Using aggregation to optimize long-term production planning at an underground mine (Q852993) (← links)
- A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty (Q1751684) (← links)
- Optimizing the open pit-to-underground mining transition (Q1752806) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)
- A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain (Q1926728) (← links)
- Uncertainty integration in dynamic mining reserves (Q2040718) (← links)
- Short- and medium-term optimization of underground mine planning using constraint programming (Q2112619) (← links)
- Strategic planning of an underground mine with variable cut-off grades (Q2218873) (← links)
- Short-term planning optimization model for underground mines (Q2289891) (← links)
- Long-term room and pillar mine production planning based on fuzzy 0-1 linear programing and multicriteria clustering algorithm with uncertainty (Q2298265) (← links)
- Hierarchical benders decomposition for open-pit mine block sequencing (Q2830758) (← links)
- Joint optimization of pricing and planning decisions in divergent supply chain (Q2865167) (← links)
- A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines (Q2940058) (← links)
- Network optimization for the design of underground mines (Q3418121) (← links)
- A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models (Q3503570) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)
- Improving the productivity of the copper mining process in the Chilean copper industry (Q5147624) (← links)
- An efficient decision making process for vehicles operations in underground mining (Q5247683) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)